FAA Powerplant Rating · ACS Subject Area AM.III

FAA Powerplant Practice Test

The FAA Powerplant knowledge test is 100 questions, 2 hours, and a 70% pass mark — 70 correct answers. SkyLicense gives you free, ACS-aligned Powerplant practice tests covering reciprocating and turbine engines, propellers, fuel metering, and ignition, so you can simulate the real exam at a PSI testing center and walk in confident.

100

Questions

2h

Time Limit

70%

Pass Mark (70 correct)

AM.III

ACS Subject Area

Four questions from the Powerplant bank

Straight from the SkyLicense question bank, in the real exam format: three choices, one correct answer. Open a question to read the explanation and the reference it cites.

Question 1 — open to see the answer

During an inspection, you find a small oil leak at the accessory case gasket. What is the best course of action?

A. Replace the gasket and torque the bolts to specification.

B. Apply sealant over the gasket and tighten.

C. Tighten the bolts until the leak stops.

Answer: A

Replacing the gasket is the proper repair; over-tightening can distort the case. Torque to spec per AC 43.13-1B. Reference: AC 43.13-1B.

Question 2 — open to see the answer

A technician observes that the cylinder head temperature (CHT) gauge on a piston engine reads low during climb. The engine is running smoothly. What is the most likely cause?

A. A stuck-open thermostat in the cooling system.

B. A faulty CHT gauge or thermocouple.

C. Excessive engine oil consumption.

Answer: B

A low CHT reading during climb, when engine load and cooling demands are high, is abnormal. A faulty gauge or thermocouple is the most likely cause, as a stuck-open thermostat would affect coolant temperature, not CHT directly. Excessive oil consumption and carburetor heat issues do not directly cause low CHT. Reference: FAA Powerplant Handbook, AC 43.13-1B.

Question 3 — open to see the answer

During a routine preflight inspection, you discover the oil suction screen is contaminated with metal particles. The engine is a turbocharged piston engine with a wet sump. What is the MOST appropriate next action?

A. Clean the screen and return the aircraft to service, noting the finding in the logbook.

B. Replace the screen and add oil, then perform a ground run to verify oil pressure.

C. Secure the aircraft and perform a thorough troubleshooting inspection to determine the source of the metallic contamination before any further engine operation.

Answer: C

Metallic particles in the oil suction screen indicate internal engine wear or damage. Continuing to operate or merely cleaning the screen risks catastrophic engine failure. The correct action is to ground the aircraft and investigate the source of contamination (e.g., bearing, gear, or piston damage). This aligns with AC 43.13-1B Chapter 5 (Powerplant Inspection) and 14 CFR 91.7 (Civil aircraft airworthiness). Returning to service without troubleshooting would be an unsafe maintenance decision.

Question 4 — open to see the answer

A technician is inspecting the induction system for leaks. Which method is most appropriate for detecting a leak in a turbocharged induction system?

A. Pressurize the system with shop air and listen for leaks

B. Spray soapy water on all connections while the engine is running

C. Use a stethoscope to listen for air leaks while the engine is idling

Answer: A

Pressurizing the induction system with shop air (typically at low pressure) and listening for leaks is a common and effective method for detecting leaks in turbocharged systems. Spraying soapy water can be used but is less practical for large systems. A stethoscope is used for mechanical noises, not air leaks. Carbon monoxide detection is for exhaust leaks, not induction leaks. Reference: FAA Powerplant Handbook, Induction System Leak Testing; AC 43.13-1B.

How to Prepare for the FAA Powerplant Test

  1. 1

    Learn the AM.III subject areas first

    Study each ACS subject area with the FAA Powerplant Handbook (FAA-H-8083-32) and AC 43.13-1B before testing yourself.

  2. 2

    Take timed full-length simulations

    Run the 100-question, 2-hour Powerplant simulation on SkyLicense. Practice pacing — you have about 72 seconds per question on test day.

  3. 3

    Review explanations and retake weak areas

    Use your per-subject score report to target weak topics, then retake simulations until you consistently score above 80%.

For a complete study plan, see the FAA A&P study checklist and the complete A&P licensing guide.

Powerplant Practice Test FAQ

How many questions are on the FAA Powerplant knowledge test?

The FAA Powerplant knowledge test has 100 multiple-choice questions. You have 2 hours to complete it and must score 70% or higher — 70 correct answers — to pass. The test covers ACS subject area AM.III (Powerplant).

What topics are covered on the FAA Powerplant test?

The FAA Powerplant test covers aircraft engines and related systems per the Aviation Mechanic ACS (FAA-S-ACS-1), subject area AM.III: reciprocating engines, turbine engines, propellers, fuel metering systems, ignition and starting, lubrication, cooling, exhaust, and engine electrical systems.

Is the Powerplant knowledge test required for an A&P certificate?

Yes, if you are pursuing the Powerplant rating. Every mechanic candidate must pass the General knowledge test, plus the Powerplant test for the Powerplant rating and the Airframe test for the Airframe rating. Most mechanics pass all three and hold both ratings (A&P).

Where do I take the FAA Powerplant knowledge test?

You take the FAA Powerplant knowledge test at an FAA-approved computer testing center operated by the FAA testing service, PSI. You schedule the test after completing FAA Form 8610-2. The test is the same nationwide — 100 questions, 2 hours, 70% pass mark.

What is the passing score for the Powerplant test?

The passing score is 70%. On the 100-question Powerplant knowledge test, that means you must answer at least 70 questions correctly. The Powerplant and Airframe tests both use this rule, while the 60-question General test requires 42 correct answers.

How long should I study for the FAA Powerplant test?

Most candidates study 4–6 weeks per knowledge test. Focus on the ACS AM.III subject areas — especially reciprocating and turbine engine theory — and practice with timed simulations. When you can consistently score above 80%, you are ready for the real exam.

Pass the Powerplant Test with Confidence

Practice 100-question timed simulations, review ACS-aligned explanations, and track your score on every AM.III subject area.

Start Your Free Practice Test